Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

May 21, 2008     Elevator controls - (2.2 hours)       Category: Controls
I got my nerve up to drill the oh-so-critical pushrod attach holes in the elevator horns today. It was one tenth as stressful as I figured it would be.

First, I drilled the #12 hole through the left horn, which is my forward-most horn. I did this on the workbench to make sure it was perfectly straight. Then I reattached the left elevator.

Next, I very securely clamped the elevators in trail and measured everything again, just to make sure. Then I measured the distance between the horns and cut a small block of hardwood that would fit perfectly between them. I drilled a #12 hole though the wood block with a drill press, then positioned it between the horns and clamped it. Then I simply drilled though the block and made a perfect, matching hole in the right horn. Worked great.

Next, I attached the elevator pushrods from back to front, making sure the control sticks were vertical. I had to do a bit of trimming along the edge of one hole though a fuselage bulkhead in order for the pushrod to clear sufficiently. At long last, I was able to move the sticks and feel the glassy-smooth elevator control, and watch the control surfaces move! Cool! Too bad it'll all have to come apart for painting soon. Oh well.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.